18-Story Ocean Villas Condominiums, Long Beach, CA
Tallest tunnel-formed structures constructed in a
region of highest seismic risk
Owner:
Genesis Real Estate Group, Inc., Dallas, TX
Architect: EDI
Architecture, Inc., Houston, TX
Structural Engineer:
Englekirk Partners Consulting Structural Engineers, Inc., Orange County, CA
General Contractor:
Summit Builders Construction Co., Irvine, CA
Concrete Sub-Contractor: Highrise Concrete
Systems, Inc., Irving TX Photo courtesy
of Highrise Concrete Systems,
Inc.
BauGrid®
WRG™
are being used in the Ocean Villas Condominium Project, a twin high-rise
multi-family project in Long Beach, California. The project consists of two
18-story towers, each with an additional 3-stories of subterranean parking. The
project will encompass a total of 576 units and 630,000 square feet. For
REAL TIME pictures of this project, visit the Summit Builders website. http://www.summitbuilders.com/cameraOceans.asp
You can also find the
PCA case study for this project here
http://www.cement.org/buildings/buildings_luxury_ocean.asp |